'Fern' in 'City Walk' area project description# Fern Central Park
Developer and TimelineFern Central Park is developed by Meraas Holding, a member of Dubai Holding. The project was launched in Q4 2022 as the final phase of Central Park in City Walk. Construction began following the launch, with the project currently 82.54% complete as of October 31, 2025. The expected completion and handover date is September 2026 (Q3 2026).
Architecture and DesignThe development features a 22-storey high-rise complex with contemporary architectural styling that blends modern design with natural materials. The distinctive design creates a nature-inspired urban environment, harmonizing energy and tranquility while offering breathtaking views of the lush Central Park below.
Layout and Unit TypesFern Central Park offers a diverse range of residential options including 1, 2, 3, and 4-bedroom apartments alongside exclusive 4-bedroom duplex penthouses. The unit types and their specifications are as follows:
| Unit Type |
Built-up Area (sqft) |
Bedrooms |
| Type A.1, A.2 |
1,736 |
4 |
| Type B.1 |
1,343 |
2 |
| Type B.2, B.3 |
1,352 |
2 |
| Type C1 |
1,193 |
2 |
| Type D1 |
1,125 |
2 |
AmenitiesThe project offers comprehensive facilities including 24/7 security, private beach access, a world-class health care centre, kids play areas, restaurants, outdoor pools, cycling trails, jogging trails, running tracks, spa and sauna facilities, yoga and meditation spaces, and water activity options.
Location and Beach AccessFern Central Park is strategically positioned in City Walk, Dubai's vibrant neighbourhood. The development is surrounded by luxury hotels, fine dining establishments, and premier shopping destinations. Beach access is convenient, with Jumeirah Beach approximately 10 minutes away and La Mer Beach also nearby. Burj Al Arab is approximately 15 minutes away, while City Walk Mall is just 1 minute away.
Nearby ProjectsThe surrounding area features other Meraas developments including Meraas Myrtle (expected Q2 2025), Meraas Thyme (expected Q3 2026), and the Crestlane collection phases (expected Q4 2028). These projects collectively create a comprehensive residential and lifestyle ecosystem within City Walk.